Chapter 60Missed: The Public Missed Commitments Scorecard
Vote on the proposals, hear the audio, read the reviews, search the whole plan.
In this chapter
- 60.1 Purpose
- 60.2 Missed Is a Factual Status
- 60.3 Failure Is a Judgment
- 60.4 Responsible Stop
- 60.5 External Block
- 60.6 Democratic Rejection
- 60.7 Evidence Changed
- 60.8 City Execution Failure
- 60.9 Shared Failure
- 60.10 Unknown Cause
- 60.11 Missed Commitment Register
- 60.12 No Separate Hidden List
- 60.13 Original Promise
- 60.14 Original Date
- 60.15 Original Scope
- 60.16 Original Cost Assumption
- 60.17 Responsible Authority
- 60.18 Miss Date
- 60.19 Do Not Wait Until Year Four
- 60.20 Completed Late
- 60.21 Late Does Not Become On Time
- 60.22 Revised Target
- 60.23 Original Miss Still Exists
- 60.24 Revision Before Deadline
- 60.25 Revision Requires Governance
- 60.26 No Last-Minute Date Laundering
- 60.27 Deadline Change Test
- 60.28 At Risk
- 60.29 At Risk Is Early Warning
- 60.30 At Risk Is Not Shame
- 60.31 No "On Track" Without Evidence
- 60.32 At-Risk Indicators
- 60.33 Early Warning Date
- 60.34 Public Disclosure Date
- 60.35 Warning Gap
- 60.36 Confidentiality
- 60.37 Confidential Does Not Mean Forever
- 60.38 No Surprise Failure
- 60.39 Major Commitment Escalation
- 60.40 Council Notification
- 60.41 Mayor Notification
- 60.42 Mayor Is Not Project Manager
- 60.43 Escalation Is Not Micromanagement
- 60.44 Recovery Plan
- 60.45 Recovery Plan Fields
- 60.46 Recovery Has Limits
- 60.47 Stop Test
- 60.48 Sunk Cost
- 60.49 Sunk Cost Is Not Reason to Continue
- 60.50 Sunk Cost Still Matters
- 60.51 Financial Exposure
- 60.52 Financial Exposure Categories
- 60.53 Staff Time
- 60.54 Material Staff Cost
- 60.55 Sunk Cost Table
- 60.56 Grant Repayment
- 60.57 No Grant Panic
- 60.58 Cancellation Cost
- 60.59 Complete Cost Again
- 60.60 Operating Tail
- 60.61 Maintenance Tail
- 60.62 Replacement Tail
- 60.63 Responsible Stop Example
- 60.64 Do Not Hide Sunk Cost to Make Stop Look Better
- 60.65 Do Not Continue to Hide Sunk Cost Either
- 60.66 Resident Impact
- 60.67 Possible Resident Impacts
- 60.68 No Invented Private Loss
- 60.69 Qualitative Impact
- 60.70 Safety Impact
- 60.71 Accessibility Impact
- 60.72 Financial Impact
- 60.73 Rights Impact
- 60.74 Temporary Mitigation
- 60.75 Mitigation Is Not Completion
- 60.76 Root Cause Review
- 60.77 Cause Is Not Excuse
- 60.78 Primary Cause
- 60.79 Contributing Causes
- 60.80 Cause Categories
- 60.81 Do Not Overuse "Market Conditions"
- 60.82 Do Not Overuse "Unforeseen Circumstances"
- 60.83 Unknown Conditions
- 60.84 Contingency
- 60.85 Planning Error
- 60.86 Estimating Error
- 60.87 Scope Error
- 60.88 Authority Error
- 60.89 Capacity Error
- 60.90 Procurement Error
- 60.91 Vendor Error
- 60.92 Partner Error
- 60.93 Council Choice
- 60.94 Mayor Choice
- 60.95 Public Evidence
- 60.96 New Law
- 60.97 Emergency Reprioritization
- 60.98 Emergency Cannot Explain Everything Forever
- 60.99 Root Cause Versus Trigger
- 60.100 Five Whys
- 60.101 System Cause
- 60.102 Human Error
- 60.103 Accountability Does Not Mean Scapegoating
- 60.104 Individual Misconduct
- 60.105 Public Scorecard
- 60.106 Leadership Accountability
- 60.107 Authority Miss
- 60.108 Not an Excuse
- 60.109 Jurisdiction Correction
- 60.110 Example
- 60.111 Federal Authority
- 60.112 County Authority
- 60.113 Shared Jurisdiction
- 60.114 Authority Register
- 60.115 Repeat Authority Errors
- 60.116 Future Correction
- 60.117 Council Rejection
- 60.118 Democracy
- 60.119 Original Promise Matters
- 60.120 If Promise Was:
- 60.121 Record Both
- 60.122 No Council Blame Campaign
- 60.123 Council Decision Record
- 60.124 Public Consultation
- 60.125 Listening Can Change Plan
- 60.126 Do Not Call It Completed Anyway
- 60.127 "Superseded After Consultation"
- 60.128 Rights Limit
- 60.129 Evidence and Law
- 60.130 Responsible Change
- 60.131 Promise Is Accountability
- 60.132 Other Government Block
- 60.133 Evidence of Ask
- 60.134 "Waiting on Province"
- 60.135 "Waiting on Canada"
- 60.136 "Waiting on County"
- 60.137 Ask Status
- 60.138 External Block Evidence
- 60.139 No Response
- 60.140 Escalation
- 60.141 Political Attack
- 60.142 Intergovernmental Miss
- 60.143 Harbour Example
- 60.144 Crossing
- 60.145 Funding Miss
- 60.146 Funding Assumption
- 60.147 Speculative Funding
- 60.148 Grant Not Received
- 60.149 City Funding Alternative
- 60.150 Public Choice
- 60.151 Grant Application Quality
- 60.152 No Blame Without Evidence
- 60.153 Matching Requirement
- 60.154 Operating Tail
- 60.155 Lost Grant
- 60.156 Grant Repayment
- 60.157 Procurement Miss
- 60.158 No Bid
- 60.159 One Bid
- 60.160 Bid Above Budget
- 60.161 Retender
- 60.162 Scope Redesign
- 60.163 Cancel
- 60.164 Procurement Integrity Before Promise Optics
- 60.165 Sole Source
- 60.166 Artificial Contract Splitting
- 60.167 Procurement Delay Cause
- 60.168 Procurement Readiness
- 60.169 Contractor Miss
- 60.170 Contract Remedies
- 60.171 Public Reporting
- 60.172 Contractor Failure Is Not Automatically City Blamelessness
- 60.173 Contractor Bankruptcy
- 60.174 Contingency Planning
- 60.175 Deficiency
- 60.176 Warranty Failure
- 60.177 Staff Capacity Miss
- 60.178 Workload Is Real
- 60.179 Capacity Test
- 60.180 No Infinite Staff Capacity
- 60.181 Council Priority Overload
- 60.182 Priority Ranking
- 60.183 Deferred Work
- 60.184 Hidden Opportunity Cost
- 60.185 New Position
- 60.186 Contractor
- 60.187 Stop Work
- 60.188 Capacity Failure
- 60.189 Burnout Is Not Delivery Strategy
- 60.190 Overtime
- 60.191 Staff Turnover
- 60.192 Succession
- 60.193 Key-Person Dependency
- 60.194 Technology Miss
- 60.195 Software Purchased
- 60.196 Implementation Failure
- 60.197 Adoption Failure
- 60.198 Training
- 60.199 User Experience
- 60.200 Integration
- 60.201 Data Migration
- 60.202 Vendor Support
- 60.203 Privacy Gate
- 60.204 Accessibility Gate
- 60.205 Cybersecurity Gate
- 60.206 Responsible Delay
- 60.207 Technology Sunk Cost
- 60.208 Vendor Exit
- 60.209 map.ca or RealMap
- 60.210 Personal Political Cost Is Irrelevant
- 60.211 Data Miss
- 60.212 Measurement Failure
- 60.213 Baseline Required
- 60.214 Mark:
- 60.215 Unverifiable Is Not Completed
- 60.216 Data Quality
- 60.217 Improve Measurement
- 60.218 No Retroactive Cherry-Picking
- 60.219 Outcome Miss
- 60.220 Example
- 60.221 Status
- 60.222 Important Distinction
- 60.223 Learn From It
- 60.224 Pilot Design
- 60.225 Pilot Miss
- 60.226 Expansion Promise
- 60.227 Decision Gate
- 60.228 Housing Outcome Miss
- 60.229 Business Outcome Miss
- 60.230 Downtown Outcome Miss
- 60.231 Safety Outcome Miss
- 60.232 Recreation Outcome Miss
- 60.233 Youth Outcome Miss
- 60.234 Accessibility Outcome Miss
- 60.235 Privacy Outcome Miss
- 60.236 Environment Outcome Miss
- 60.237 Partnership Outcome Miss
- 60.238 Satisfaction Outcome Miss
- 60.239 Financial Outcome Miss
- 60.240 Tax Outcome Miss
- 60.241 Service Outcome Miss
- 60.242 Infrastructure Outcome Miss
- 60.243 Measure What Was Intended
- 60.244 Scope Miss
- 60.245 Partial Completion
- 60.246 No Percentage Theatre
- 60.247 Critical Missing Component
- 60.248 Optional Missing Component
- 60.249 Scope Priority
- 60.250 Minimum Viable Completion
- 60.251 Retrofitted Definition
- 60.252 Quality Miss
- 60.253 Defects
- 60.254 Rework
- 60.255 Rework Cost
- 60.256 Warranty Correction
- 60.257 Safety Deficiency
- 60.258 Accessibility Deficiency
- 60.259 Quality Acceptance
- 60.260 Public Appearance
- 60.261 Legal Miss
- 60.262 Early Legal Review
- 60.263 Rights Concern
- 60.264 Responsible Stop
- 60.265 Legal Spending
- 60.266 Privilege
- 60.267 Public Reason
- 60.268 Conflict Miss
- 60.269 That Is Not an Excuse to Bypass Conflict Rules
- 60.270 Founder-Associated Project
- 60.271 Conflict Discovered Late
- 60.272 Procurement Firewall
- 60.273 Public Trust
- 60.274 Environmental Miss
- 60.275 Due Diligence
- 60.276 Unknown Conditions Can Be Genuine
- 60.277 Contamination Liability
- 60.278 Flood Risk
- 60.279 Tree Failure
- 60.280 Building Energy Miss
- 60.281 No Forecast Rewrite
- 60.282 Partnership Miss
- 60.283 Partner Dependency Risk
- 60.284 Partner Failure Is Not Automatic City Failure
- 60.285 Backup Plan
- 60.286 Partnership Exit
- 60.287 SON Relationship
- 60.288 Respectful Unresolved Status
- 60.289 Do Not Grade SON Relationship Politically
- 60.290 Mutual Commitment
- 60.291 Confidentiality
- 60.292 County Miss
- 60.293 Shared Responsibility
- 60.294 Cost Shift
- 60.295 Ontario Miss
- 60.296 Federal Miss
- 60.297 City Advocacy Evaluation
- 60.298 No Political Blame Metric
- 60.299 Community Partner Miss
- 60.300 Capacity Review
- 60.301 Grant Recovery
- 60.302 No Public Shaming Without Due Process
- 60.303 Volunteer Project Miss
- 60.304 Volunteer Capacity
- 60.305 Critical Service
- 60.306 Demand Miss
- 60.307 Low Demand
- 60.308 Do Not Manufacture Users
- 60.309 Marketing
- 60.310 But Marketing Is Not Always Solution
- 60.311 Low Participation
- 60.312 Do Not Protect Program From Evidence
- 60.313 Equity
- 60.314 No Vulnerability Profiling
- 60.315 Cost Miss
- 60.316 Cost Threshold
- 60.317 Automatic Continuation
- 60.318 Escalation Trigger
- 60.319 No Universal 10% Rule
- 60.320 Contingency
- 60.321 Contingency Exhausted
- 60.322 Change Order
- 60.323 Change Order Pattern
- 60.324 Change Order Transparency
- 60.325 Estimate Maturity
- 60.326 Bad Promise
- 60.327 Cost Range
- 60.328 Political Pressure
- 60.329 Affordability Decision
- 60.330 "Too Much Already Invested"
- 60.331 Time Miss
- 60.332 Delay Cost
- 60.333 Delay Benefit
- 60.334 Delay Evaluation
- 60.335 Schedule Compression
- 60.336 Election Deadline
- 60.337 Seasonal Work
- 60.338 Winter Construction
- 60.339 Contractor Availability
- 60.340 Utility Coordination
- 60.341 Permits
- 60.342 Archaeology
- 60.343 SON Engagement
- 60.344 Public Consultation
- 60.345 Rights and Due Process Before Schedule
- 60.346 Communication Miss
- 60.347 Communication Commitment
- 60.348 Advance Notice
- 60.349 Wrong Information
- 60.350 Correction
- 60.351 No Silence
- 60.352 Promise of Update
- 60.353 Update Without Substance
- 60.354 Resident Experience
- 60.355 Service Recovery
- 60.356 Recovery Options
- 60.357 No Automatic "Complete"
- 60.358 Decision Owner
- 60.359 Decision Deadline
- 60.360 Limbo Is a Status Problem
- 60.361 Review Expiry
- 60.362 "Deferred"
- 60.363 "Blocked"
- 60.364 "Waiting"
- 60.365 "Ongoing"
- 60.366 "In Progress"
- 60.367 No Zombie Commitments
- 60.368 Handoff
- 60.369 Handoff Fields
- 60.370 Handoff Is Not Recommendation to Continue Automatically
- 60.371 Neutral Handoff
- 60.372 Outgoing Political Recommendation
- 60.373 Contractual Obligation
- 60.374 Grant Obligation
- 60.375 Regulatory Obligation
- 60.376 Financial Exposure
- 60.377 Handoff Priority
- 60.378 Safety
- 60.379 Legal Deadline
- 60.380 Contract Deadline
- 60.381 Grant Deadline
- 60.382 Routine Policy
- 60.383 No Political Booby Trap
- 60.384 Records Complete
- 60.385 Passwords and Systems
- 60.386 Vendor Contacts
- 60.387 Partner Contacts
- 60.388 Council History
- 60.389 Decision History
- 60.390 Why It Missed
- 60.391 Lesson Register
- 60.392 Lessons Categories
- 60.393 Lesson Owner
- 60.394 Lesson Without Process Change
- 60.395 Example
- 60.396 Another Example
- 60.397 Another
- 60.398 Another
- 60.399 Another
- 60.400 Institutional Learning
- 60.401 No Repeat Failure Without Explanation
- 60.402 Repeat Cause Metric
- 60.403 Example
- 60.404 Root Cause Dashboard
- 60.405 Do Not Rank Departments by Miss Count Alone
- 60.406 Risk-Adjusted Context
- 60.407 Major Miss
- 60.408 Major Misses Separate
- 60.409 Minor Miss
- 60.410 No Burial
- 60.411 Miss Count
- 60.412 But Count Alone Misleads
- 60.413 Miss Rate
- 60.414 Do Not Use Miss Rate Alone
- 60.415 Ambition
- 60.416 Recklessness
- 60.417 Better Standard
- 60.418 Promise Quality
- 60.419 Overpromising
- 60.420 Underpromising
- 60.421 Public Value
- 60.422 At-Risk Table
- 60.423 Missed Commitment Table
- 60.424 Responsible Stop Table
- 60.425 External Block Table
- 60.426 Council Rejection Table
- 60.427 Financial Exposure Table
- 60.428 Root Cause Table
- 60.429 Handoff Table
- 60.430 Lessons Table
- 60.431 Outcome Miss Table
- 60.432 Traffic Lights
- 60.433 Status Words Matter More
- 60.434 Red Is Not Moral Condemnation
- 60.435 Grey Is Temporary
- 60.436 Cause Review Deadline
- 60.437 Responsible Stop Label
- 60.438 Honest Complexity
- 60.439 Anti-Gaming Rule One
- 60.440 Anti-Gaming Rule Two
- 60.441 Anti-Gaming Rule Three
- 60.442 Anti-Gaming Rule Four
- 60.443 Anti-Gaming Rule Five
- 60.444 Anti-Gaming Rule Six
- 60.445 Anti-Gaming Rule Seven
- 60.446 Anti-Gaming Rule Eight
- 60.447 Anti-Gaming Rule Nine
- 60.448 Anti-Gaming Rule Ten
- 60.449 Anti-Gaming Rule Eleven
- 60.450 Anti-Gaming Rule Twelve
- 60.451 Anti-Gaming Rule Thirteen
- 60.452 Anti-Gaming Rule Fourteen
- 60.453 Anti-Gaming Rule Fifteen
- 60.454 Anti-Gaming Rule Sixteen
- 60.455 Anti-Gaming Rule Seventeen
- 60.456 Anti-Gaming Rule Eighteen
- 60.457 Anti-Gaming Rule Nineteen
- 60.458 Anti-Gaming Rule Twenty
- 60.459 Anti-Gaming Rule Twenty-One
- 60.460 Anti-Gaming Rule Twenty-Two
- 60.461 Anti-Gaming Rule Twenty-Three
- 60.462 Anti-Gaming Rule Twenty-Four
- 60.463 Anti-Gaming Rule Twenty-Five
- 60.464 Anti-Gaming Rule Twenty-Six
- 60.465 Anti-Gaming Rule Twenty-Seven
- 60.466 Anti-Gaming Rule Twenty-Eight
- 60.467 Anti-Gaming Rule Twenty-Nine
- 60.468 Anti-Gaming Rule Thirty
- 60.469 Anti-Gaming Rule Thirty-One
- 60.470 Anti-Gaming Rule Thirty-Two
- 60.471 Anti-Gaming Rule Thirty-Three
- 60.472 Anti-Gaming Rule Thirty-Four
- 60.473 Anti-Gaming Rule Thirty-Five
- 60.474 Anti-Gaming Rule Thirty-Six
- 60.475 Anti-Gaming Rule Thirty-Seven
- 60.476 Anti-Gaming Rule Thirty-Eight
- 60.477 Anti-Gaming Rule Thirty-Nine
- 60.478 Anti-Gaming Rule Forty
- 60.479 Election-Year Integrity
- 60.480 Fixed Reporting Date
- 60.481 Same Definitions
- 60.482 No Election Rebranding
- 60.483 Official Report
- 60.484 Candidate Response
- 60.485 City Facts
- 60.486 No Selective Release
- 60.487 No Friday-Night Dump
- 60.488 Media Availability
- 60.489 Political Accountability
- 60.490 Staff Should Not Defend Campaign Promise
- 60.491 Final-Year New Commitments
- 60.492 Necessary New Work
- 60.493 Four-Year Cut-Off
- 60.494 Ongoing City Work
- 60.495 First-Year Baseline
- 60.496 Year One Risk Review
- 60.497 Correct Early
- 60.498 Year Two
- 60.499 No Mid-Term Victory Only
- 60.500 Year Three
- 60.501 Year Three Decision
- 60.502 Do Not Carry False Hope
- 60.503 Year Four
- 60.504 Do Not Finish What Should Be Stopped
- 60.505 Year Four Handoff
- 60.506 Four-Year Core Measures
- 60.507 Completed on Time
- 60.508 Completed Late
- 60.509 Missed and Continuing
- 60.510 Missed and Stopped
- 60.511 Missed and Superseded
- 60.512 Missed, External Block
- 60.513 Missed, Democratic Rejection
- 60.514 Outcome Miss
- 60.515 Unverifiable Outcome
- 60.516 No One Headline Percentage
- 60.517 Four-Year Missed Commitments Audit
- 60.518 Name the Biggest Miss
- 60.519 Name the Most Expensive Miss
- 60.520 Name the Largest Sunk Cost
- 60.521 Name the Largest Remaining Financial Exposure
- 60.522 Name the Most Delayed Commitment
- 60.523 Name the Most Important Outcome Miss
- 60.524 Name a Commitment That Was Correctly Stopped
- 60.525 Name a Commitment the City Should Have Stopped Earlier
- 60.526 Name a Commitment Council Rejected
- 60.527 Name a Commitment Blocked by Ontario
- 60.528 Name a Commitment Blocked by Canada
- 60.529 Name a Commitment Blocked by Grey County or another required partner
- 60.530 Name a Commitment That Failed Because the City Misunderstood Its Authority
- 60.531 Name a Commitment That Failed Because Its Scope Was Poorly Defined
- 60.532 Name a Commitment That Failed Because the Original Estimate Was Weak
- 60.533 Name a Procurement Failure
- 60.534 Name a Contractor Failure
- 60.535 Name a Capacity Failure
- 60.536 Name a Technology Failure
- 60.537 Name an Initiative That Was Operationally Delivered but Missed Its Intended Outcome
- 60.538 Name a Pilot That Proved the Original Idea Should Not Continue
- 60.539 Name a Major Lesson the City Actually Implemented
- 60.540 Name a Lesson the City Failed to Implement
- 60.541 Name the Largest Missed Commitment Being Handed to the Next Council
- 60.542 Name the Most Urgent Handoff Decision
- 60.543 Promise Test
- 60.544 Deadline Test
- 60.545 Delivery Test
- 60.546 Authority Test
- 60.547 Early Warning Test
- 60.548 Disclosure Test
- 60.549 Cause Test
- 60.550 Responsibility Test
- 60.551 Cost Test
- 60.552 Exposure Test
- 60.553 Resident Test
- 60.554 Recovery Test
- 60.555 Stop Test
- 60.556 Sunk-Cost Test
- 60.557 Rights Test
- 60.558 Procurement Test
- 60.559 Safety Test
- 60.560 Staff Test
- 60.561 Partner Test
- 60.562 Government Test
- 60.563 Outcome Test
- 60.564 Measurement Test
- 60.565 Lesson Test
- 60.566 Repeat-Failure Test
- 60.567 Handoff Test
- 60.568 Political Test
- 60.569 Election Test
- 60.570 Institution Test
- 60.571 What Success Looks Like
- 60.572 What Failure Looks Like
- 60.573 The Missed Commitments Scorecard Commitment
A credible government should be able to publish a page titled:
What We Missed.
Not:
Challenges Encountered.
Not:
Priorities Still Advancing.
Not:
Transformational Work Continuing Into the Future.
If something was promised for the four-year term and it was not delivered:
Say so.
That does not mean every missed commitment represents:
- incompetence;
- waste;
- dishonesty;
- bad leadership.
A commitment can be missed because:
- Council voted against it;
- Ontario would not authorize it;
- Canada did not act;
- a partner withdrew;
- land could not be acquired;
- legal review identified a problem;
- the complete cost became unreasonable;
- public evidence showed the idea was weak;
- a pilot failed;
- market conditions changed;
- an emergency changed priorities;
- a contractor failed;
- staff capacity was insufficient;
- the City made a planning mistake.
Those are very different situations.
They should not be hidden under one number.
The central principle is:
A government that can publicly name what it missed is more trustworthy than one that changes the definition of success.
Another principle is equally important:
A missed promise and a responsible decision can exist at the same time.
If government promised:
We will build X.
Then discovers that X would:
- cost far more than expected;
- create unacceptable liability;
- violate rights;
- fail the public-value test;
the responsible decision may be:
Do not build X.
The original commitment was still:
- not completed.
Both facts belong in the record.
The Missed Scorecard exists so government can say:
We said this.
It did not happen.
Here is why.
Here is what it cost.
Here is what we learned.
Here is what still needs to happen.
Here is what the next Council inherits.
That is not political weakness.
That is public stewardship.
60.1Purpose
The Missed Scorecard should answer:
What did the City say it would do?
What was due?
What was not delivered?
What part was completed?
What remains?
Why was it missed?
Was the cause inside City control?
Was another government responsible for the final action?
Did Council deliberately reject it?
Did evidence change?
Did the cost become unreasonable?
Was the commitment poorly designed from the beginning?
When did the City first know the commitment was at risk?
When did residents learn that?
How much money was spent?
What contractual or financial obligations remain?
Did anything useful result despite the miss?
Should the next Council continue it?
Should it be stopped permanently?
What will the City do differently next time?
Those are the questions.
60.2Missed Is a Factual Status
The word:
missed
should not automatically mean:
- blame.
It means the original commitment or target was:
- not achieved as promised.
60.3Failure Is a Judgment
Failure should be used more carefully.
A failure may involve:
- preventable mistake;
- inadequate planning;
- poor execution;
- bad governance;
- unresolved risk.
60.4Responsible Stop
A commitment may be:
Missed, Responsible Stop
if the original promise was not delivered but stopping became the better decision.
60.5External Block
A commitment may be:
Missed, External Block
where another required authority or party prevented completion.
60.6Democratic Rejection
A commitment may be:
Missed, Council Rejected
where Council lawfully decided:
- no.
60.7Evidence Changed
A commitment may be:
Missed, Evidence Changed
where the original idea no longer passed:
- cost;
- safety;
- legal;
- public-value;
tests.
60.8City Execution Failure
A commitment may be:
Missed, City Execution
where the City had the authority and reasonable ability to deliver but did not.
60.9Shared Failure
A commitment may be:
Missed, Shared Responsibility
where City and partner failures both contributed.
60.10Unknown Cause
Sometimes:
Missed, Cause Under Review
is the honest status.
Do not invent certainty.
60.11Missed Commitment Register
The City should maintain a specific view of the Commitment Register showing:
- all missed;
- at-risk;
- incomplete;
commitments.
60.12No Separate Hidden List
The Missed Scorecard should use the same underlying public commitment dataset as Section 59.
60.13Original Promise
Preserve.
60.14Original Date
Preserve.
60.15Original Scope
Preserve.
60.16Original Cost Assumption
Preserve where one existed.
60.17Responsible Authority
Preserve.
60.18Miss Date
Record when the commitment actually became:
- overdue;
- impossible;
- formally stopped.
60.19Do Not Wait Until Year Four
A commitment becomes missed when its deadline passes without delivery.
Not when:
- election report is written.
60.20Completed Late
If commitment is eventually finished:
Its final status may be:
Completed Late
while the original deadline miss remains visible.
60.21Late Does Not Become On Time
Never rewrite the original date.
60.22Revised Target
A legitimate revised date may be adopted.
60.23Original Miss Still Exists
If original deadline already passed:
The historical miss remains.
60.24Revision Before Deadline
A deadline may sometimes be revised before it is missed because:
- scope;
- external conditions;
- evidence;
changed.
60.25Revision Requires Governance
A revised deadline should identify:
- who authorized it;
- why;
- when.
60.26No Last-Minute Date Laundering
Do not move a deadline:
- the afternoon before it expires;
solely to avoid a Red status.
60.27Deadline Change Test
Ask:
Would we have approved this revised date if there were no public Scorecard?
60.28At Risk
Before a commitment is missed:
Use:
At Risk
where evidence shows significant delivery concern.
60.29At Risk Is Early Warning
It should encourage:
- correction;
- support;
- decision.
60.30At Risk Is Not Shame
Good project management identifies risk early.
60.31No "On Track" Without Evidence
A commitment with:
- no owner;
- no funding;
- no active work;
should not remain:
On Track
because its deadline is still months away.
60.32At-Risk Indicators
Possible:
- schedule slippage;
- unresolved approval;
- budget gap;
- procurement failure;
- partner dependency;
- staff capacity;
- unresolved property issue;
- design problem;
- legal concern.
60.33Early Warning Date
Track when risk was first formally identified.
60.34Public Disclosure Date
Track when material risk became public.
60.35Warning Gap
A useful accountability question:
How long did City Hall know before residents were told?
60.36Confidentiality
Some risk may initially require:
- confidential legal;
- procurement;
- negotiation;
handling.
60.37Confidential Does Not Mean Forever
When lawful and practical:
Publish enough to explain the status.
60.38No Surprise Failure
Residents should not discover on the final day of the term that a major promise had been stalled for:
- two years.
60.39Major Commitment Escalation
At-risk major commitments should receive:
- senior administrative review.
60.40Council Notification
Where Council direction or budget decision is required:
Bring it forward.
60.41Mayor Notification
The Mayor should know major strategic risks.
60.42Mayor Is Not Project Manager
Administration manages:
- operations.
60.43Escalation Is Not Micromanagement
Council may need to decide:
- scope;
- funding;
- priority;
- continuation.
60.44Recovery Plan
An at-risk commitment may receive:
- recovery plan.
60.45Recovery Plan Fields
Problem
Cause
Corrective action
Cost
Revised schedule
Decision required
Risk if no action
60.46Recovery Has Limits
Do not throw:
- unlimited money;
at a commitment simply because it was promised.
60.47Stop Test
At each major recovery decision:
Ask:
Is completing the original commitment still the best use of public resources?
60.48Sunk Cost
Money already spent is:
- sunk.
60.49Sunk Cost Is Not Reason to Continue
A bad project does not become good because:
- $500,000 has already been spent.
60.50Sunk Cost Still Matters
Report it.
60.51Financial Exposure
Every material missed commitment should show:
- money spent;
- contractual obligations;
- recoverable funds;
- remaining exposure.
60.52Financial Exposure Categories
Possible:
Design
Consulting
Land
Procurement
Construction
Software
Legal
Staff
Grant Repayment
Termination
Operating
60.53Staff Time
Do not attempt to assign an invented dollar value to every staff conversation.
60.54Material Staff Cost
For major failed projects:
Staff time may be significant enough to estimate.
Label methodology.
60.55Sunk Cost Table
Possible:
| Commitment | Spent to Date | Recoverable | Remaining Obligation | Status |
60.56Grant Repayment
A failed or stopped project may trigger:
- repayment;
- lost funding.
Show.
60.57No Grant Panic
Do not continue an irresponsible project solely because:
we might lose the grant.
Compare:
- grant;
- remaining City cost;
- future liability.
60.58Cancellation Cost
Sometimes paying:
- cancellation cost;
is cheaper than continuing.
60.59Complete Cost Again
Use full lifecycle analysis.
60.60Operating Tail
A project may be affordable to build but unaffordable to:
- operate.
60.61Maintenance Tail
Same.
60.62Replacement Tail
Same.
60.63Responsible Stop Example
A project with:
- $2 million spent;
may still deserve cancellation if proceeding requires:
- another $30 million;
- permanent operating burden;
- weak public benefit.
60.64Do Not Hide Sunk Cost to Make Stop Look Better
Publish.
60.65Do Not Continue to Hide Sunk Cost Either
Both choices require honesty.
60.66Resident Impact
A missed commitment should describe practical resident impact where known.
60.67Possible Resident Impacts
- service unavailable;
- longer wait;
- continued flooding;
- delayed housing;
- deferred recreation;
- unresolved accessibility barrier;
- continued infrastructure risk;
- wasted public money;
- inconvenience.
60.68No Invented Private Loss
Do not claim:
businesses lost $4 million
unless reliable evidence exists.
60.69Qualitative Impact
Sometimes:
Residents continue to use the temporary route
is enough.
60.70Safety Impact
If miss affects safety:
Give it higher priority.
60.71Accessibility Impact
Likewise.
60.72Financial Impact
Likewise.
60.73Rights Impact
Likewise.
60.74Temporary Mitigation
If full commitment was missed:
Show what temporary action exists.
60.75Mitigation Is Not Completion
Keep distinction.
60.76Root Cause Review
Material misses should receive:
- root-cause analysis.
60.77Cause Is Not Excuse
The purpose is improvement.
60.78Primary Cause
Identify where reasonably possible.
60.79Contributing Causes
Also record.
60.80Cause Categories
Possible:
Commitment Design
Jurisdiction
Legal
Scope
Estimate
Budget
Funding
Procurement
Staff Capacity
Contractor
Technology
Data
Land
Utility
Partner
Ontario
Canada
County
Market
Weather
Emergency
Demand
Evidence
Political Decision
60.81Do Not Overuse "Market Conditions"
Explain what changed.
60.82Do Not Overuse "Unforeseen Circumstances"
Name them where possible.
60.83Unknown Conditions
Sometimes real.
Example:
- buried infrastructure;
- contamination;
- structural condition.
60.84Contingency
Ask whether such unknowns should reasonably have been anticipated.
60.85Planning Error
Say when:
- due diligence was inadequate.
60.86Estimating Error
Say when:
- original estimate was weak.
60.87Scope Error
Say when:
- commitment was not clearly defined.
60.88Authority Error
Say when campaign or Council assumed:
- City controlled something it did not.
60.89Capacity Error
Say when administration lacked:
- staff;
- expertise;
- time.
60.90Procurement Error
Say when procurement approach:
- failed;
- delayed;
- attracted no bids;
- produced unsuitable result.
60.91Vendor Error
Say when vendor failed.
60.92Partner Error
Say when partner failed.
60.93Council Choice
Say when Council changed direction.
60.94Mayor Choice
Say when mayoral leadership changed recommendation.
60.95Public Evidence
Say when public input or evidence changed:
- decision.
60.96New Law
Say when legislation or regulation changed.
60.97Emergency Reprioritization
May be legitimate.
60.98Emergency Cannot Explain Everything Forever
After emergency:
Reassess.
60.99Root Cause Versus Trigger
A contractor bankruptcy may trigger failure.
Poor contract resilience may still be:
- contributing cause.
60.100Five Whys
A simple root-cause technique may help internally.
Do not make public reporting gimmicky.
60.101System Cause
Look beyond:
- individual mistake.
60.102Human Error
Ask why system allowed:
- predictable error.
60.103Accountability Does Not Mean Scapegoating
A good Missed Scorecard should improve:
- systems.
60.104Individual Misconduct
If serious misconduct occurred:
Handle through proper:
- HR;
- legal;
- professional;
process.
60.105Public Scorecard
Do not turn into:
- employee blame board.
60.106Leadership Accountability
Elected and administrative leaders should still accept responsibility for:
- systems.
60.107Authority Miss
Some campaign commitments may prove outside municipal jurisdiction.
60.108Not an Excuse
A candidate should have checked.
60.109Jurisdiction Correction
Publish:
Original assumption
Actual authority
What City could lawfully do
What it did
60.110Example
If Ontario controls the required statutory change:
City can:
- advocate;
- propose;
- pilot where permitted.
It cannot claim:
- final provincial action.
60.111Federal Authority
Same.
60.112County Authority
Same.
60.113Shared Jurisdiction
Complexity should be mapped early.
60.114Authority Register
Cross-reference.
60.115Repeat Authority Errors
If several promises fail because of jurisdiction misunderstanding:
That indicates:
- governance weakness.
60.116Future Correction
Require jurisdiction review earlier in future platforms or business plans.
60.117Council Rejection
A Mayor may bring forward a proposal and lose the vote.
60.118Democracy
That is not automatically:
- execution failure.
60.119Original Promise Matters
If promise was:
I will bring this to Council
then bringing it forward may be:
- completed.
60.120If Promise Was:
The City will implement this
and Council rejects it:
The outcome commitment was:
- missed.
60.121Record Both
Mayor action completed
Municipal outcome not approved
60.122No Council Blame Campaign
Official City report should state:
- vote;
- reason;
factually.
60.123Council Decision Record
Link to:
- resolution;
- report;
where appropriate.
60.124Public Consultation
A consultation may lead Council to:
- reject original proposal.
60.125Listening Can Change Plan
That can be good government.
60.126Do Not Call It Completed Anyway
The original outcome still changed.
60.127"Superseded After Consultation"
May be appropriate.
60.128Rights Limit
Majority opposition alone cannot justify violating:
- rights;
- law.
60.129Evidence and Law
Remain governing constraints.
60.130Responsible Change
The City should not become captive to:
we promised it, so we must do it regardless of evidence.
60.131Promise Is Accountability
Not:
- irrational lock-in.
60.132Other Government Block
Some commitments require another government's action.
60.133Evidence of Ask
Show that City actually:
- asked;
- followed up;
- provided needed information.
60.134"Waiting on Province"
Is not credible if City:
- never submitted the request.
60.135"Waiting on Canada"
Same.
60.136"Waiting on County"
Same.
60.137Ask Status
Cross-reference Section 57.
60.138External Block Evidence
Possible:
- formal refusal;
- unresolved approval;
- legislation;
- funding decision;
- regulator requirement.
60.139No Response
Can be a real block.
Show:
- dates;
- follow-ups.
60.140Escalation
Use proportionate escalation.
60.141Political Attack
Not substitute for:
- precise advocacy.
60.142Intergovernmental Miss
Final report should distinguish:
- City completed its ask;
- outside outcome not delivered.
60.143Harbour Example
If City seeks federal action on harbour:
Record:
- City request;
- federal response;
- due diligence;
- unresolved items.
Do not call federal inaction:
- City completion.
60.144Crossing
Same.
60.145Funding Miss
A project may depend on:
- outside funding.
60.146Funding Assumption
Original business case should have identified:
- secured;
- applied;
- speculative;
funding.
60.147Speculative Funding
Should never be presented as:
- guaranteed.
60.148Grant Not Received
If project depended on it:
Reassess.
60.149City Funding Alternative
Do not automatically fill grant gap with:
- property tax.
Return to Council.
60.150Public Choice
Possible:
Continue with City funding
Reduce scope
Delay
Seek alternative funding
Stop
60.151Grant Application Quality
Review whether application failure resulted from:
- eligibility;
- timing;
- weak proposal;
- competition.
60.152No Blame Without Evidence
Do not say:
Ottawa refused Owen Sound
when City simply:
- was not eligible.
60.153Matching Requirement
A grant may require City contribution.
Show.
60.154Operating Tail
Again.
60.155Lost Grant
If deadline missed through City error:
Say so.
60.156Grant Repayment
If required because project failed:
Say so.
60.157Procurement Miss
Procurement can delay or derail commitments.
60.158No Bid
Could indicate:
- market;
- scope;
- terms;
- price.
Review.
60.159One Bid
Requires careful value assessment.
60.160Bid Above Budget
Do not force award merely to protect promise.
60.161Retender
May be right.
60.162Scope Redesign
May be right.
60.163Cancel
May be right.
60.164Procurement Integrity Before Promise Optics
Never weaken procurement fairness simply to:
- meet a political deadline.
60.165Sole Source
Do not misuse because:
- election is approaching.
60.166Artificial Contract Splitting
Never.
60.167Procurement Delay Cause
If internal procurement began too late:
Say so.
60.168Procurement Readiness
Future lesson may be:
- finish design earlier;
- define scope better;
- engage market lawfully.
60.169Contractor Miss
A contractor can fail:
- schedule;
- quality;
- capacity.
60.170Contract Remedies
Use appropriate:
- contractual;
- legal;
process.
60.171Public Reporting
Report project impact without prejudicing:
- active legal claims.
60.172Contractor Failure Is Not Automatically City Blamelessness
Ask:
- procurement;
- due diligence;
- contract administration.
60.173Contractor Bankruptcy
Could be largely external.
60.174Contingency Planning
Still review.
60.175Deficiency
Persistent defects may prevent true completion.
60.176Warranty Failure
Track.
60.177Staff Capacity Miss
The City may promise more work than staff can realistically deliver.
60.178Workload Is Real
Do not blame employees for:
- impossible plan.
60.179Capacity Test
Before major commitments:
Ask:
Who does the work?
What stops?
Is expertise available?
Is temporary support needed?
60.180No Infinite Staff Capacity
Every new priority consumes:
- time.
60.181Council Priority Overload
If Council approves 100 urgent priorities:
Everything cannot be:
- first.
60.182Priority Ranking
Needed.
60.183Deferred Work
Show what was displaced.
60.184Hidden Opportunity Cost
Do not pretend new projects have no effect on existing workload.
60.185New Position
May sometimes be justified.
60.186Contractor
May sometimes be better.
60.187Stop Work
May sometimes be better.
60.188Capacity Failure
If management knew work was impossible but continued promising:
That is governance failure.
60.189Burnout Is Not Delivery Strategy
Do not complete political promises by:
- exhausting staff.
60.190Overtime
Track when material.
60.191Staff Turnover
Could affect delivery.
60.192Succession
Could affect delivery.
60.193Key-Person Dependency
Identify.
60.194Technology Miss
Digital projects frequently fail through:
- unclear scope;
- vendor lock-in;
- integration;
- migration;
- adoption;
- privacy;
- accessibility.
60.195Software Purchased
Does not mean:
- project succeeded.
60.196Implementation Failure
If system cannot perform promised function:
Report.
60.197Adoption Failure
If staff or residents do not use it:
Investigate why.
60.198Training
May be inadequate.
60.199User Experience
May be poor.
60.200Integration
May fail.
60.201Data Migration
May fail.
60.202Vendor Support
May fail.
60.203Privacy Gate
May appropriately stop launch.
60.204Accessibility Gate
Same.
60.205Cybersecurity Gate
Same.
60.206Responsible Delay
Better to delay unsafe system than:
- launch for deadline optics.
60.207Technology Sunk Cost
Do not keep bad software merely because:
- licence was paid.
60.208Vendor Exit
Use.
60.209map.ca or RealMap
Any conflict-sensitive system should be stopped or delayed if:
- governance;
- procurement;
- privacy;
- conflict;
standards are not satisfied.
60.210Personal Political Cost Is Irrelevant
Do not launch a Mayor-associated project simply to avoid embarrassment.
60.211Data Miss
Sometimes a commitment cannot be measured because baseline:
- never existed.
60.212Measurement Failure
That itself may be a failure.
60.213Baseline Required
If promise said:
reduce response time
and City never measured initial response time:
Outcome cannot be verified.
60.214Mark:
Outcome Unverifiable
where necessary.
60.215Unverifiable Is Not Completed
Do not assume success.
60.216Data Quality
Poor data can make target reporting unreliable.
60.217Improve Measurement
But preserve uncertainty.
60.218No Retroactive Cherry-Picking
Do not choose a favourable historical comparison after the fact.
60.219Outcome Miss
A commitment can be operationally completed but miss its outcome.
60.220Example
City launches a new service designed to:
- reduce repeated contacts.
The service launches.
Repeated contacts do not decline.
60.221Status
Could be:
Implementation Completed, Outcome Missed.
60.222Important Distinction
The City did what it said operationally.
The theory did not work.
60.223Learn From It
Outcome failure can be more useful than:
- hidden failure.
60.224Pilot Design
Pilots should make outcome failure safe enough to learn from.
60.225Pilot Miss
A pilot that shows:
- no demand;
- high cost;
- poor result;
can still be successfully completed as a pilot.
60.226Expansion Promise
If City promised permanent expansion regardless of pilot evidence:
That was poor commitment design.
60.227Decision Gate
Better.
60.228Housing Outcome Miss
Approvals may rise while:
- occupied homes do not.
Do not claim supply outcome.
60.229Business Outcome Miss
Program registrations may rise while:
- business outcomes do not.
60.230Downtown Outcome Miss
Events may grow while:
- vacancy;
- maintenance;
- ordinary-day use;
do not improve.
60.231Safety Outcome Miss
New program may launch while:
- targeted safety issue persists.
60.232Recreation Outcome Miss
Facility investment may occur while:
- participation remains weak.
60.233Youth Outcome Miss
Youth meetings may increase while:
- paid work;
- skills;
- projects;
do not.
60.234Accessibility Outcome Miss
Policy may improve while:
- physical barriers remain.
60.235Privacy Outcome Miss
Policy may be adopted while:
- unnecessary data continues to be collected.
60.236Environment Outcome Miss
Trees may be planted while:
- survival remains poor.
60.237Partnership Outcome Miss
MOU may be signed while:
- coordination remains weak.
60.238Satisfaction Outcome Miss
Survey process may improve while:
- resident experience declines.
60.239Financial Outcome Miss
Budget may be balanced while:
- deferred liability grows.
60.240Tax Outcome Miss
Rate may be lower while:
- tax requirement;
- fees;
- future pressure;
rise.
60.241Service Outcome Miss
Tickets may close faster while:
- repeat issues increase.
60.242Infrastructure Outcome Miss
Capital spending may rise while:
- condition confidence;
- preventive maintenance;
remain weak.
60.243Measure What Was Intended
Do not substitute an easier metric when the real outcome disappoints.
60.244Scope Miss
A project may deliver only part of original scope.
60.245Partial Completion
Report:
- exact delivered scope;
- exact missing scope.
60.246No Percentage Theatre
Do not say:
92% complete
if the missing 8% is the feature that makes the project useful.
60.247Critical Missing Component
Highlight.
60.248Optional Missing Component
Different.
60.249Scope Priority
Not all scope is equal.
60.250Minimum Viable Completion
If originally defined:
May be legitimate.
60.251Retrofitted Definition
Do not invent minimum scope after problems arise merely to claim:
- success.
60.252Quality Miss
A project can finish physically but fail:
- quality.
60.253Defects
Track.
60.254Rework
Track where material.
60.255Rework Cost
Show.
60.256Warranty Correction
Show.
60.257Safety Deficiency
High priority.
60.258Accessibility Deficiency
High priority.
60.259Quality Acceptance
Use professionals.
60.260Public Appearance
A project looking finished does not mean:
- technically accepted.
60.261Legal Miss
A project may fail legal review.
60.262Early Legal Review
Should reduce this.
60.263Rights Concern
If legal review finds significant:
- Charter;
- privacy;
- accessibility;
- conflict;
risk:
Stop or redesign.
60.264Responsible Stop
Better than:
- unlawful promise completion.
60.265Legal Spending
Report material legal costs.
60.266Privilege
Do not disclose privileged advice improperly.
60.267Public Reason
Provide enough to explain:
- decision;
without waiving privilege unnecessarily.
60.268Conflict Miss
A project may be delayed or stopped because:
- conflict governance was not resolved.
60.269That Is Not an Excuse to Bypass Conflict Rules
Never.
60.270Founder-Associated Project
Requires independent process.
60.271Conflict Discovered Late
Ask why it was not identified earlier.
60.272Procurement Firewall
Must remain.
60.273Public Trust
Better to miss a project than:
- compromise integrity.
60.274Environmental Miss
Unexpected contamination may block:
- land;
- construction.
60.275Due Diligence
Review whether reasonable investigation occurred.
60.276Unknown Conditions Can Be Genuine
Do not pretend every underground issue was predictable.
60.277Contamination Liability
Show.
60.278Flood Risk
If evidence shows site inappropriate:
Change plan.
60.279Tree Failure
If tree cohort performs poorly:
Report:
- survival miss.
60.280Building Energy Miss
If retrofit underperforms forecast:
Report.
60.281No Forecast Rewrite
Do not lower original expectation after result arrives without showing both.
60.282Partnership Miss
A partner may:
- withdraw;
- lose funding;
- change leadership;
- fail delivery.
60.283Partner Dependency Risk
Should have been identified.
60.284Partner Failure Is Not Automatic City Failure
But resident impact remains.
60.285Backup Plan
Review.
60.286Partnership Exit
Use Section 57.
60.287SON Relationship
A relationship commitment may remain unresolved without being:
- failure.
60.288Respectful Unresolved Status
Use accurate language.
60.289Do Not Grade SON Relationship Politically
Do not classify disagreement as:
- City success;
- Indigenous failure.
60.290Mutual Commitment
Only score agreed commitments appropriately.
60.291Confidentiality
Protect appropriate relationship discussions.
60.292County Miss
City-County issues may remain unresolved.
60.293Shared Responsibility
Show each government's role.
60.294Cost Shift
Do not hide unresolved issues by moving cost.
60.295Ontario Miss
A provincial ask may be:
- declined;
- unanswered.
60.296Federal Miss
Same.
60.297City Advocacy Evaluation
Was the ask:
- precise;
- timely;
- evidence-based?
60.298No Political Blame Metric
The Scorecard should not rank governments by:
- partisan hostility.
60.299Community Partner Miss
A nonprofit may not deliver.
60.300Capacity Review
Ask whether City should have assessed:
- staffing;
- governance;
- insurance;
- financial health;
more carefully.
60.301Grant Recovery
If partner grant unused or misused:
Apply agreement.
60.302No Public Shaming Without Due Process
Report institutional facts.
60.303Volunteer Project Miss
A volunteer project may stall.
60.304Volunteer Capacity
Do not treat volunteers as:
- contractual labour;
unless agreement says so.
60.305Critical Service
Do not depend solely on volunteer delivery without contingency.
60.306Demand Miss
A program may attract little use.
60.307Low Demand
Can justify:
- modification;
- closure.
60.308Do Not Manufacture Users
No.
60.309Marketing
May be part of problem.
60.310But Marketing Is Not Always Solution
Maybe residents simply:
- do not want it.
60.311Low Participation
Ask:
Awareness?
Price?
Access?
Schedule?
Poor design?
No demand?
60.312Do Not Protect Program From Evidence
If no demand:
Stop.
60.313Equity
Low participation by one group may reflect:
- barrier.
Investigate appropriately.
60.314No Vulnerability Profiling
Use privacy-safe methods.
60.315Cost Miss
Original project may become much more expensive.
60.316Cost Threshold
Before launch:
Major projects should define when cost increase triggers:
- Council reconsideration.
60.317Automatic Continuation
No.
60.318Escalation Trigger
Possible:
- percentage;
- dollar;
- scope;
threshold.
Use project scale.
60.319No Universal 10% Rule
Different projects require different tolerance.
60.320Contingency
Spending contingency is not automatically:
- overrun.
60.321Contingency Exhausted
Worth reporting.
60.322Change Order
May be legitimate.
60.323Change Order Pattern
Repeated changes can indicate:
- weak design.
60.324Change Order Transparency
Show material changes.
60.325Estimate Maturity
An early conceptual estimate should not be compared directly with final cost without noting:
- maturity.
60.326Bad Promise
Do not promise exact cost before sufficient design certainty.
60.327Cost Range
May be better early.
60.328Political Pressure
Do not force unrealistically low early estimates.
60.329Affordability Decision
If project no longer passes complete-cost test:
Stop or redesign.
60.330"Too Much Already Invested"
Not enough.
60.331Time Miss
Some commitments simply take longer.
60.332Delay Cost
A delay may create:
- inflation;
- temporary repair;
- lost grant;
- resident inconvenience.
60.333Delay Benefit
A delay may also allow:
- better design;
- lower risk;
- funding;
- consultation.
60.334Delay Evaluation
Show both.
60.335Schedule Compression
Trying to recover lost time can increase:
- cost;
- risk.
60.336Election Deadline
Never compress unsafe work merely to finish before voting day.
60.337Seasonal Work
Weather windows matter.
60.338Winter Construction
May be inappropriate for some work.
60.339Contractor Availability
Can matter.
60.340Utility Coordination
Can matter.
60.341Permits
Can matter.
60.342Archaeology
Can matter.
60.343SON Engagement
Can matter.
Do not bypass engagement to recover schedule.
60.344Public Consultation
Same.
60.345Rights and Due Process Before Schedule
Always.
60.346Communication Miss
Sometimes the project is delayed but the larger failure is:
- nobody told residents.
60.347Communication Commitment
Track separately where material.
60.348Advance Notice
Could have prevented frustration.
60.349Wrong Information
Can worsen delay.
60.350Correction
Use Section 55.
60.351No Silence
If timeline slips materially:
Update.
60.352Promise of Update
If City promises monthly update:
Measure it.
60.353Update Without Substance
Do not publish:
work continues
for six months.
Say what is:
- blocked;
- next.
60.354Resident Experience
Section 58 can reveal whether:
- communication failure;
made miss worse.
60.355Service Recovery
A miss should have recovery response.
60.356Recovery Options
Complete
Redesign
Replace
Transfer
Pause
Stop
Handoff
60.357No Automatic "Complete"
Sometimes the right recovery is:
- stop.
60.358Decision Owner
Identify.
60.359Decision Deadline
Avoid indefinite limbo.
60.360Limbo Is a Status Problem
A commitment should not remain:
Under Review
for years.
60.361Review Expiry
Major reviews should have:
- next decision date.
60.362"Deferred"
Needs:
- reason;
- next date.
60.363"Blocked"
Needs:
- actual block.
60.364"Waiting"
Needs:
- who;
- what;
- since when.
60.365"Ongoing"
Needs:
- active work.
60.366"In Progress"
Needs:
- current next step.
60.367No Zombie Commitments
If no active work and no planned decision:
Use:
Not Proceeding
or another accurate status.
60.368Handoff
A missed commitment continuing beyond the term requires:
- handoff package.
60.369Handoff Fields
Original commitment
Current status
Work completed
Work remaining
Money spent
Remaining cost
Contracts
Legal issues
Partner commitments
Key risks
Next required decision
Recommended timing
60.370Handoff Is Not Recommendation to Continue Automatically
The next Council decides.
60.371Neutral Handoff
Provide facts.
60.372Outgoing Political Recommendation
Can be stated separately.
60.373Contractual Obligation
Clearly distinguish:
- legally binding;
- policy preference.
60.374Grant Obligation
Same.
60.375Regulatory Obligation
Same.
60.376Financial Exposure
Same.
60.377Handoff Priority
Some incomplete items are urgent.
60.378Safety
Flag.
60.379Legal Deadline
Flag.
60.380Contract Deadline
Flag.
60.381Grant Deadline
Flag.
60.382Routine Policy
Lower urgency.
60.383No Political Booby Trap
Do not intentionally leave:
- rushed;
- opaque;
- difficult;
commitments for successor.
60.384Records Complete
Provide.
60.385Passwords and Systems
Institutional.
60.386Vendor Contacts
Institutional.
60.387Partner Contacts
Institutional.
60.388Council History
Included.
60.389Decision History
Included.
60.390Why It Missed
Included.
60.391Lesson Register
Every significant miss should produce a short lesson.
60.392Lessons Categories
Possible:
Plan Better
Scope Better
Estimate Better
Engage Earlier
Check Authority
Fund Earlier
Procure Earlier
Staff Properly
Pilot First
Stop Earlier
Measure Better
Communicate Better
60.393Lesson Owner
Someone should apply it.
60.394Lesson Without Process Change
Weak.
60.395Example
Lesson:
Check jurisdiction earlier.
Process change:
Every future major initiative receives an Authority Map before budget submission.
60.396Another Example
Lesson:
Bids arrived over budget.
Process change:
Major capital procurement requires estimate update before tender.
60.397Another
Lesson:
Residents were surprised by construction.
Process change:
Neighbour notification standard added before mobilization.
60.398Another
Lesson:
Program had no demand.
Process change:
Future optional service pilots require demand test before permanent staffing.
60.399Another
Lesson:
Vendor locked the City in.
Process change:
Export and exit tests added before technology renewal.
60.400Institutional Learning
This is why misses must remain visible.
60.401No Repeat Failure Without Explanation
If same failure happens again:
Show why lesson was not applied.
60.402Repeat Cause Metric
Track recurring causes.
60.403Example
If four projects fail because of:
- incomplete scope;
that is organizational pattern.
60.404Root Cause Dashboard
Could show:
- number of material misses by cause.
60.405Do Not Rank Departments by Miss Count Alone
Some departments manage:
- more;
- harder;
projects.
60.406Risk-Adjusted Context
Use narrative and scale.
60.407Major Miss
Define in advance.
Possible criteria:
- large financial exposure;
- significant service impact;
- legal;
- safety;
- city-wide;
- major campaign commitment.
60.408Major Misses Separate
Publish prominently.
60.409Minor Miss
Still track.
60.410No Burial
Do not bury a:
- $20 million project failure;
among:
- 40 missed minor tasks.
60.411Miss Count
Can be reported.
60.412But Count Alone Misleads
Use:
- significance;
- category;
- cause.
60.413Miss Rate
If used:
Miss Rate = Finite Commitments Due but Not Delivered by the Agreed Deadline ÷ Finite Commitments Due
60.414Do Not Use Miss Rate Alone
A City could improve it by:
- promising almost nothing.
60.415Ambition
Some ambitious commitments will fail.
60.416Recklessness
Ambition does not justify:
- careless promises.
60.417Better Standard
Ask:
Were commitments ambitious but grounded, and were misses managed honestly?
60.418Promise Quality
Cross-reference Section 59.
60.419Overpromising
Repeated uncosted promises are:
- governance problem.
60.420Underpromising
A government should not game Scorecard by promising only:
- trivial work.
60.421Public Value
Commitments should be:
- meaningful.
60.422At-Risk Table
| Commitment | Original Due Date | Risk | Cause | Recovery Action | Next Decision |
60.423Missed Commitment Table
| Commitment | Original Promise | Original Due | Final Status | Primary Cause | Cost to Date | Handoff |
60.424Responsible Stop Table
| Commitment | Reason Stopped | Cost to Date | Cost Avoided / Remaining Exposure | Decision Evidence |
Avoid presenting estimated avoided cost as:
- verified saving.
60.425External Block Table
| Commitment | External Authority / Partner | City Action Completed | Block | Next Step |
60.426Council Rejection Table
| Commitment | Proposal Presented | Council Decision | Date | Result |
60.427Financial Exposure Table
| Commitment | Spent | Contracted | Recoverable | Remaining Liability | Funding Source |
60.428Root Cause Table
| Cause | Major Misses | Examples | Process Change |
60.429Handoff Table
| Commitment | Remaining Work | Remaining Cost | Urgency | Next Decision |
60.430Lessons Table
| Miss | Lesson | Process Change | Owner | Implemented? |
60.431Outcome Miss Table
| Completed Initiative | Intended Outcome | Actual Outcome | Status | Next Decision |
60.432Traffic Lights
Green
Not generally used for missed commitments.
Could indicate:
- responsible recovery completed.
Amber
Commitment at risk, delayed or partially delivered with active recovery.
Red
Commitment missed, materially failed or outcome significantly below commitment.
Grey
Cause, evidence or outcome not yet sufficiently known.
60.433Status Words Matter More
Do not use colour to soften:
- Missed.
60.434Red Is Not Moral Condemnation
It means:
- commitment did not meet the defined standard.
60.435Grey Is Temporary
A major miss should not remain Grey indefinitely.
60.436Cause Review Deadline
Set.
60.437Responsible Stop Label
May deserve a distinct symbol rather than pretending it is:
- Green completion.
60.438Honest Complexity
A commitment can be:
Missed, but stopping prevented larger loss.
Say exactly that.
60.439Anti-Gaming Rule One
Do not delete missed commitments from the register.
60.440Anti-Gaming Rule Two
Do not change original promise wording after the miss.
60.441Anti-Gaming Rule Three
Do not move the original deadline after it has passed and call the commitment on time.
60.442Anti-Gaming Rule Four
Do not change a four-year commitment into:
long-term vision
after it becomes clear it will not be completed.
60.443Anti-Gaming Rule Five
Do not relabel:
Missed
as:
Ongoing
without active work and a real future decision.
60.444Anti-Gaming Rule Six
Do not use:
Under Review
indefinitely.
60.445Anti-Gaming Rule Seven
Do not say:
Waiting on another government
if the City has not completed its own required submission.
60.446Anti-Gaming Rule Eight
Do not blame Council if the proposal was never brought forward.
60.447Anti-Gaming Rule Nine
Do not blame staff for workload created by unrealistic political commitments.
60.448Anti-Gaming Rule Ten
Do not blame a contractor without reviewing City procurement and contract administration.
60.449Anti-Gaming Rule Eleven
Do not call cost escalation unforeseeable when the original estimate had little design behind it.
60.450Anti-Gaming Rule Twelve
Do not hide scope reduction while claiming the project was nearly completed.
60.451Anti-Gaming Rule Thirteen
Do not count partial delivery as complete because the missing part is difficult.
60.452Anti-Gaming Rule Fourteen
Do not substitute an easier outcome metric after the intended outcome fails.
60.453Anti-Gaming Rule Fifteen
Do not call program usage success when the original target was:
- service improvement.
60.454Anti-Gaming Rule Sixteen
Do not call funding secured:
- project delivered.
60.455Anti-Gaming Rule Seventeen
Do not call money spent:
- public benefit delivered.
60.456Anti-Gaming Rule Eighteen
Do not call a responsible stop a completion.
60.457Anti-Gaming Rule Nineteen
Do not call every stopped project a failure.
60.458Anti-Gaming Rule Twenty
Do not hide failed pilots.
60.459Anti-Gaming Rule Twenty-One
Do not keep a failed pilot running simply to avoid admitting failure.
60.460Anti-Gaming Rule Twenty-Two
Do not create a new pilot name and pretend the old failed initiative disappeared.
60.461Anti-Gaming Rule Twenty-Three
Do not remove sunk costs from public reporting because the project was cancelled.
60.462Anti-Gaming Rule Twenty-Four
Do not count avoided future spending as a verified saving automatically.
60.463Anti-Gaming Rule Twenty-Five
Do not use estimated opportunity cost as a precise dollar loss without evidence.
60.464Anti-Gaming Rule Twenty-Six
Do not assign every miss to:
external factors.
60.465Anti-Gaming Rule Twenty-Seven
Do not assign every miss to:
previous Council.
Inherited problems should be identified separately.
60.466Anti-Gaming Rule Twenty-Eight
Do not assign every miss to:
staff.
60.467Anti-Gaming Rule Twenty-Nine
Do not hide misses because litigation or negotiation limits some detail.
Publish what can lawfully be said.
60.468Anti-Gaming Rule Thirty
Do not classify a project as confidential simply because:
- status is embarrassing.
60.469Anti-Gaming Rule Thirty-One
Do not hide late projects until after the election.
60.470Anti-Gaming Rule Thirty-Two
Do not accelerate unsafe work to avoid a Red status before election day.
60.471Anti-Gaming Rule Thirty-Three
Do not sign incomplete acceptance documents for political timing.
60.472Anti-Gaming Rule Thirty-Four
Do not pressure staff or professionals to change status.
60.473Anti-Gaming Rule Thirty-Five
Do not create dozens of trivial completed tasks to numerically drown major misses.
60.474Anti-Gaming Rule Thirty-Six
Do not combine multiple missed promises into one category to reduce miss count.
60.475Anti-Gaming Rule Thirty-Seven
Do not invent new commitments after successful work to improve the apparent completion ratio.
60.476Anti-Gaming Rule Thirty-Eight
Do not remove politically inconvenient outcomes from the final audit.
60.477Anti-Gaming Rule Thirty-Nine
Do not let a campaign write the official explanation of a miss.
60.478Anti-Gaming Rule Forty
Do not let City administration write political excuses either.
Use factual institutional language.
60.479Election-Year Integrity
Year Four is where the Missed Scorecard matters most.
60.480Fixed Reporting Date
Publish final pre-election audit according to:
- predetermined schedule.
60.481Same Definitions
Use the same:
- Missed;
- Deferred;
- Blocked;
- Stopped;
- Complete;
definitions used earlier.
60.482No Election Rebranding
Never.
60.483Official Report
Neutral.
60.484Candidate Response
Candidates can argue:
- why;
- whether;
a miss was justified.
That belongs to:
- politics.
60.485City Facts
Remain:
- institutional.
60.486No Selective Release
Do not release:
- completed promises;
weeks before:
- missed promises.
Publish together.
60.487No Friday-Night Dump
Major accountability reports should be released:
- normally;
- accessibly.
60.488Media Availability
Staff may explain:
- methodology;
- data.
60.489Political Accountability
Elected officials may explain:
- decisions.
60.490Staff Should Not Defend Campaign Promise
Not their role.
60.491Final-Year New Commitments
Do not add new commitments merely so they can be:
- quickly completed.
60.492Necessary New Work
Can still arise.
Track separately.
60.493Four-Year Cut-Off
Only promises genuinely part of the four-year program belong in:
- campaign commitment score.
60.494Ongoing City Work
Continue regardless.
60.495First-Year Baseline
Year One should identify:
- all major commitments;
- completion tests;
- deadlines;
- authority;
- dependencies.
60.496Year One Risk Review
Identify early:
- jurisdiction errors;
- uncosted promises;
- capacity gaps.
60.497Correct Early
Better to revise in:
- month three;
than pretend for:
- four years.
60.498Year Two
Publish:
- misses;
- delays;
- responsible stops;
already occurring.
60.499No Mid-Term Victory Only
The annual report should contain:
- bad news.
60.500Year Three
Identify commitments unlikely to finish by term end.
60.501Year Three Decision
Choose:
- recover;
- reduce openly;
- stop;
- handoff.
60.502Do Not Carry False Hope
If completion is impossible:
Say so.
60.503Year Four
Finish what is responsibly finishable.
60.504Do Not Finish What Should Be Stopped
Key.
60.505Year Four Handoff
Prepare remaining:
- files;
- costs;
- obligations;
- decisions.
60.506Four-Year Core Measures
Strong measures include:
- total finite commitments due;
- completed on time;
- completed late;
- missed;
- responsible stops;
- Council rejections;
- external blocks;
- outcome misses;
- major financial exposure;
- major schedule misses;
- repeated root causes;
- handoff commitments;
- lessons implemented.
60.507Completed on Time
Distinct.
60.508Completed Late
Distinct.
60.509Missed and Continuing
Distinct.
60.510Missed and Stopped
Distinct.
60.511Missed and Superseded
Distinct.
60.512Missed, External Block
Distinct.
60.513Missed, Democratic Rejection
Distinct.
60.514Outcome Miss
Distinct.
60.515Unverifiable Outcome
Distinct.
60.516No One Headline Percentage
The full picture matters.
60.517Four-Year Missed Commitments Audit
At term end publish:
Commitments missed
Completed late
Major commitments missed
Responsible stops
Council rejections
External-government blocks
Partner failures
Funding failures
Procurement failures
Contractor failures
Capacity failures
Technology failures
Legal or authority errors
Outcome misses
Scope reductions
Quality failures
Cost overruns linked to incomplete work
Sunk costs
Remaining contractual exposure
Grant repayments
Resident impacts
Temporary mitigations
Root causes
Repeated causes
Lessons implemented
Lessons not yet implemented
Handoffs to the next Council
60.518Name the Biggest Miss
Use evidence.
60.519Name the Most Expensive Miss
60.520Name the Largest Sunk Cost
60.521Name the Largest Remaining Financial Exposure
60.522Name the Most Delayed Commitment
60.523Name the Most Important Outcome Miss
60.524Name a Commitment That Was Correctly Stopped
60.525Name a Commitment the City Should Have Stopped Earlier
If applicable.
60.526Name a Commitment Council Rejected
60.527Name a Commitment Blocked by Ontario
Where accurate.
60.528Name a Commitment Blocked by Canada
Where accurate.
60.529Name a Commitment Blocked by Grey County or another required partner
Where accurate.
60.530Name a Commitment That Failed Because the City Misunderstood Its Authority
60.531Name a Commitment That Failed Because Its Scope Was Poorly Defined
60.532Name a Commitment That Failed Because the Original Estimate Was Weak
60.533Name a Procurement Failure
60.534Name a Contractor Failure
60.535Name a Capacity Failure
60.536Name a Technology Failure
60.537Name an Initiative That Was Operationally Delivered but Missed Its Intended Outcome
60.538Name a Pilot That Proved the Original Idea Should Not Continue
60.539Name a Major Lesson the City Actually Implemented
60.540Name a Lesson the City Failed to Implement
60.541Name the Largest Missed Commitment Being Handed to the Next Council
60.542Name the Most Urgent Handoff Decision
60.543Promise Test
Ask:
Was this actually promised?
60.544Deadline Test
Ask:
Was it actually due?
60.545Delivery Test
Ask:
Was the promised deliverable actually completed?
60.546Authority Test
Ask:
Did the City control the result?
60.547Early Warning Test
Ask:
When did we first know it might fail?
60.548Disclosure Test
Ask:
When did residents find out?
60.549Cause Test
Ask:
Why was it missed?
60.550Responsibility Test
Ask:
Which cause was inside City control?
60.551Cost Test
Ask:
How much public money was spent before the miss?
60.552Exposure Test
Ask:
What financial obligation remains?
60.553Resident Test
Ask:
What practical consequence did residents experience?
60.554Recovery Test
Ask:
Is there still a responsible path to completion?
60.555Stop Test
Ask:
Would continuing now create more public value than stopping?
60.556Sunk-Cost Test
Ask:
Are we continuing because the project is still good, or because we are embarrassed by what has already been spent?
60.557Rights Test
Ask:
Would completing the promise create a rights, privacy, accessibility or fairness problem?
60.558Procurement Test
Ask:
Would completing the promise require weakening fair procurement?
If yes:
Do not.
60.559Safety Test
Ask:
Would schedule recovery compromise safety or technical quality?
If yes:
Do not.
60.560Staff Test
Ask:
Are we demanding unsustainable workload merely to protect political optics?
60.561Partner Test
Ask:
Did the partner actually fail, or did the City fail to fulfil its own responsibilities first?
60.562Government Test
Ask:
Did the other government actually reject or block the request, or are we simply using it as an excuse?
60.563Outcome Test
Ask:
Did the initiative produce the result used to justify it?
60.564Measurement Test
Ask:
Can that outcome actually be verified?
60.565Lesson Test
Ask:
What changed in City practice because this went wrong?
60.566Repeat-Failure Test
Ask:
Have we made this same mistake before?
60.567Handoff Test
Ask:
Does the next Council receive enough information to make a decision immediately?
60.568Political Test
Ask:
Would we describe this miss the same way if another party, Mayor or Council had caused it?
The answer should be:
Yes.
60.569Election Test
Ask:
Would this commitment still be marked Missed if voting day were tomorrow?
60.570Institution Test
Ask:
Could a completely new Council understand what happened without hearing the outgoing administration's political explanation?
It should.
60.571What Success Looks Like
A successful Missed Scorecard does not mean:
- few misses at any cost;
- every promise gets completed;
- no project is stopped;
- every external government agrees;
- every pilot works;
- every estimate is perfect.
Success means:
- misses are identified early;
- deadlines remain visible;
- risks are escalated;
- residents are informed;
- external dependencies are documented;
- City-caused failures are acknowledged;
- responsible stops are not disguised;
- sunk costs remain visible;
- rights and safety are not sacrificed to political promises;
- lessons produce process changes;
- repeated causes decline;
- unfinished work receives a proper handoff;
- election-year reporting uses exactly the same rules as the rest of the term.
60.572What Failure Looks Like
Failure includes:
- quietly deleting promises;
- moving deadlines after they are missed;
- relabelling failed commitments as long-term visions;
- leaving projects "under review" for years;
- blaming Ontario when the City never made a complete request;
- blaming staff for impossible workloads;
- blaming contractors without examining poor City procurement;
- calling cost increases unforeseeable when the original estimate was speculative;
- shrinking scope and claiming near completion;
- replacing failed outcome measures with easier activity measures;
- continuing bad projects because too much has already been spent;
- launching unsafe work to beat an election deadline;
- hiding sunk costs;
- hiding grant repayments;
- hiding failed pilots;
- keeping unused programs alive to avoid admitting low demand;
- delaying bad news until after voting day;
- overwhelming final reports with minor successes so major failures disappear.
60.573The Missed Commitments Scorecard Commitment
Owen Sound should commit to:
Publish what the City missed, not only what it completed.
Treat Missed as a factual status rather than automatic moral condemnation.
Distinguish City execution failures, responsible stops, democratic rejection, external blocks, changed evidence and shared responsibility.
Allow cause to remain under review temporarily when evidence is incomplete rather than inventing certainty.
Use the same underlying Commitment Register for completed and missed commitments.
Preserve the original promise, scope, target date, cost assumption and authority.
Record when a commitment actually became overdue or formally stopped.
Classify later delivery as Completed Late rather than rewriting history as On Time.
Never erase an original missed deadline when a revised deadline is approved.
Require transparent authorization and explanation for deadline changes.
Do not move deadlines at the last minute merely to avoid a negative Scorecard status.
Use At Risk as an early-warning status before commitments fail.
Do not punish staff for identifying risk early.
Do not label inactive commitments On Track merely because their deadlines have not arrived.
Track the date major risks were first identified and when residents were informed.
Do not allow major failures to remain hidden internally for years.
Escalate at-risk major commitments through the appropriate administrative and governance channels.
Use recovery plans with clear causes, corrective actions, costs and decisions.
Do not spend unlimited public money merely because a promise was made.
Apply the continuing-value test to every troubled commitment.
Recognize sunk cost without allowing sunk cost to dictate future decisions.
Publish money already spent on significant failed or stopped commitments.
Show recoverable funds, contractual obligations, termination costs and remaining exposure.
Do not invent precise staff-cost figures where the methodology does not support them.
Show grant repayment or clawback risks.
Do not continue an unsound project solely to preserve outside funding.
Compare the remaining public cost of completion against the public value still expected.
Include operating, maintenance and replacement obligations in recovery decisions.
Describe practical resident impacts of significant misses.
Do not fabricate private economic losses for political effect.
Show temporary mitigation separately from permanent completion.
Perform root-cause analysis on material misses.
Distinguish causes from excuses.
Use consistent cause categories so repeated organizational patterns can be identified.
Do not hide behind vague phrases such as market conditions or unforeseen circumstances when the actual cause can be described.
Acknowledge inadequate due diligence where it occurred.
Acknowledge weak estimating where it occurred.
Acknowledge unclear scope where it occurred.
Acknowledge jurisdiction errors where they occurred.
Acknowledge inadequate capacity where it occurred.
Acknowledge procurement and contract-administration failures where they occurred.
Distinguish external events from City-created problems.
Look for system causes rather than simply identifying the individual closest to the mistake.
Handle individual misconduct through proper professional, HR or legal systems rather than through public scorecard shaming.
Hold leadership accountable for organizational systems.
Publish when a commitment failed because the City misunderstood its legal authority.
Show what the City could lawfully do instead.
Use repeated jurisdiction errors as a signal to improve future Authority Maps.
Record Council rejection honestly.
Distinguish a Mayor completing a promise to bring something forward from the City actually implementing the proposal.
Do not turn official City reporting into blame toward councillors who voted differently.
Allow public consultation and evidence to change an original proposal.
Do not call a changed proposal the original promise completed.
Never continue an unwise commitment merely because changing course may be politically embarrassing.
For commitments dependent on another government, show the City's actual request, follow-up and response.
Do not claim the City is waiting on Ontario, Canada, Grey County or another partner if the City has not completed its own required work.
Use precise evidence when classifying an external block.
Distinguish City advocacy from the final decision of another government.
Label outside funding as secured, applied for or speculative from the beginning.
Do not present speculative grants as guaranteed financing.
Return to Council when outside funding fails rather than automatically transferring the gap to property taxpayers.
Explain whether grant failure resulted from eligibility, timing, proposal weakness or external competition.
Do not accuse another government of refusing support when the City was never eligible.
Report lost grants caused by City error.
Report repayment obligations where project failure triggers them.
Treat procurement integrity as more important than political schedule.
Do not weaken competitive processes merely to finish a promise before an election.
Review no-bid, one-bid and over-budget procurement results for underlying scope and market issues.
Retender, redesign, reduce scope or stop where public value requires it.
Never misuse sole-source procurement for political timing.
Review City procurement and contract administration before assigning all blame to a contractor.
Protect legitimate legal positions when contractor disputes are active while still reporting project status.
Treat staff capacity as a real constraint.
Do not make employees the scapegoat for more political priorities than the organization can realistically deliver.
Require capacity planning for significant new initiatives.
Show what existing work will be delayed when major new work is added.
Do not rely on chronic overtime and staff burnout as a promise-delivery strategy.
Identify key-person dependencies and succession risks.
Treat software purchase as the beginning of implementation, not proof of success.
Report digital projects that fail through integration, migration, privacy, accessibility, cybersecurity or user adoption.
Allow privacy, security and accessibility gates to delay or stop politically important technology projects.
Do not keep failed software merely because licensing money has already been spent.
Apply the strictest independence and conflict standards to technology associated with the Mayor or other elected officials.
Never launch a conflict-sensitive system simply to protect its founder from political embarrassment.
Recognize missing baseline data as a possible implementation failure.
Do not claim measurable improvement where the City failed to establish the original measurement.
Use Outcome Unverifiable where evidence cannot support a result.
Never select a favourable historical baseline after results are known.
Distinguish implementation completion from outcome achievement.
Allow the honest status: Implementation Completed, Outcome Missed.
Use pilots to test theories without forcing permanent continuation.
Treat a pilot that disproves the idea as useful evidence.
Do not promise permanent expansion before pilot evidence exists.
Apply the same outcome honesty to housing, business, downtown, safety, recreation, youth, accessibility, privacy, environment, partnerships, satisfaction, finance, tax, services and infrastructure.
Never replace a failed outcome with an easier activity metric.
Show exact delivered and undelivered scope on partially completed work.
Do not use vague percentages to hide the importance of missing components.
Do not invent a lower minimum completion threshold after delivery trouble begins.
Track quality failures, rework, defects and warranty problems where material.
Do not call a project technically complete merely because it looks finished.
Allow legal and rights concerns to stop original commitments.
Do not compromise Charter, privacy, accessibility, conflict or procurement obligations simply to preserve a promise.
Provide a sufficient public explanation of legal stops without unnecessarily waiving privilege.
Do not bypass conflict rules to prevent a project from appearing missed.
Review whether late-discovered conflicts should have been identified earlier.
Treat integrity as more important than completion percentage.
Use environmental due diligence to distinguish genuine unknown conditions from inadequate planning.
Show contamination and other inherited liabilities honestly.
Report environmental outcome misses such as poor tree survival or underperforming energy retrofits against their original expectations.
Do not lower forecasts retrospectively without showing the original forecast.
Distinguish partner failures from City failures while still reporting the resident impact.
Do not politically grade government-to-government disagreement with Saugeen Ojibway Nation as a partnership failure.
Score only mutually agreed commitments appropriately.
Distinguish City and Grey County responsibility on shared misses.
Report provincial and federal asks that were declined or unanswered without partisan scorekeeping.
Evaluate whether the City's advocacy was precise, timely and evidence-based.
Review community-partner capacity before relying on organizations for significant public delivery.
Do not publicly shame partner organizations without fair process.
Do not make critical services dependent on fragile volunteer capacity without contingency.
Treat low demand as real evidence.
Investigate whether low use reflects awareness, access, price, design or genuine lack of interest.
Do not manufacture participation merely to preserve a program.
Stop weak programs where evidence supports it.
Use privacy-safe methods when investigating participation barriers.
Set reconsideration triggers for major cost escalation.
Do not use one arbitrary percentage for every type of project.
Distinguish contingency use from true cost overrun.
Track material change orders and repeated patterns.
Explain estimate maturity when comparing early concepts with final cost.
Do not force unrealistically precise early estimates for political announcements.
Stop or redesign projects that no longer pass the Complete Cost test.
Measure both the cost and the possible benefit of delay.
Do not compress schedules in ways that create unsafe or low-quality work.
Do not let an election deadline override seasonal, technical, legal, Indigenous engagement or public-consultation requirements.
Treat communication failure as a separate accountability issue when residents were unnecessarily left uninformed.
Do not publish meaningless updates saying only that work continues.
Tell residents what is blocked and what happens next.
Give troubled commitments a clear recovery choice: complete, redesign, replace, transfer, pause, stop or hand off.
Do not allow Under Review, Deferred, Blocked, Waiting, Ongoing or In Progress to become permanent hiding places.
Require each of those statuses to have a reason and next decision.
Eliminate zombie commitments with no active work or realistic next step.
Give every material term-end miss a complete handoff package.
Show work completed, work remaining, cost, contracts, legal issues, partner obligations, risks and next decision.
Do not imply that the next Council is politically required to continue unfinished work unless legal commitments genuinely bind the City.
Separate legal obligations from outgoing policy recommendations.
Flag safety, legal, contractual and grant deadlines in the handoff.
Do not leave political booby traps for the next administration.
Transfer complete records, credentials, vendor contacts, partner history and decision history institutionally.
Require a practical lesson from significant misses, delays and stops.
Turn lessons into changes to real City processes.
Do not publish lessons that nobody owns or implements.
Track repeated root causes across multiple projects.
Treat repeated scope, jurisdiction, procurement or capacity problems as organizational issues.
Do not rank departments solely by number of missed commitments without accounting for project scale and complexity.
Define major misses in advance and report them prominently.
Do not bury major failures among dozens of minor administrative misses.
Publish miss counts only with significance and cause context.
Do not use a low miss rate as proof of strong government if the City simply avoided meaningful commitments.
Do not use ambition as an excuse for reckless promises.
Aim for ambitious but grounded commitments and honest management when some do not work.
Publish At-Risk, Missed, Responsible Stop, External Block, Council Rejection, Financial Exposure, Root Cause, Handoff, Lesson and Outcome Miss tables.
Use Green, Amber, Red and Grey only as supporting indicators rather than substitutes for plain status language.
Never delete missed commitments.
Never rewrite original wording after failure.
Never change an expired deadline to make a miss disappear.
Never convert a four-year promise into an undefined long-term vision after it becomes inconvenient.
Never use Ongoing or Under Review indefinitely to conceal inactivity.
Never blame another government when the City's own required work remains incomplete.
Never blame Council for an initiative the Mayor never actually presented.
Never blame staff for impossible workload created by political overcommitment.
Never blame contractors without reviewing City procurement and contract management.
Never describe a speculative early estimate as if it should have been a reliable final cost.
Never hide material scope reduction.
Never substitute activity measures for failed outcomes.
Never describe funding approval, spending or program launch as the public result itself.
Never call a responsible stop a completed promise.
Never call every stopped initiative a failure.
Never hide failed pilots or keep them running only to avoid embarrassment.
Never rename a failed initiative simply to make the history disappear.
Never hide sunk costs or repayment obligations.
Never call estimated avoided future spending a verified saving automatically.
Never turn uncertain opportunity costs into precise political loss claims.
Never attribute every miss to external circumstances.
Never attribute every miss to a previous Council.
Never attribute every miss to staff.
Never use confidentiality as a blanket shield for politically inconvenient project status.
Never delay reporting until after an election.
Never accelerate unsafe work, sign premature acceptance or pressure professionals for election-year completion.
Never flood the Scorecard with tiny wins to bury major misses.
Never combine several distinct missed commitments merely to reduce the miss count.
Never allow the campaign to write the City's official explanation of failure.
Use factual institutional language in official reporting.
Publish the final pre-election Scorecard on a predetermined schedule.
Use the same definitions throughout the full four-year term.
Publish completed and missed commitments together.
Release major accountability reports accessibly and normally rather than burying them.
Keep staff responsible for explaining technical facts and elected officials responsible for political decisions.
Do not create trivial Year Four commitments merely to generate quick completions.
Use Year One to identify commitment risks, authority mistakes, cost gaps and capacity limits early.
Correct weak promises early rather than protecting them for four years.
Publish real misses and responsible stops during Years One and Two, not just victories.
Use Year Three to identify which commitments are unlikely to finish and make honest recover, stop or handoff decisions.
Use Year Four to finish what should responsibly be finished, not everything at any cost.
Publish a Four-Year Missed Commitments Audit alongside the Completed Scorecard.
Separate Completed On Time, Completed Late, Missed and Continuing, Missed and Stopped, External Block, Democratic Rejection, Outcome Miss and Unverifiable Outcome.
Name the biggest miss.
Name the most expensive miss.
Name the largest sunk cost.
Name the largest remaining financial exposure.
Name the most delayed commitment.
Name the most important outcome miss.
Name a commitment the City responsibly stopped.
Name one it should have stopped sooner if the evidence supports that conclusion.
Name major Council rejections and external-government blocks accurately.
Name commitments that failed because the City misunderstood authority, scope, cost, procurement, capacity or technology.
Name an initiative that was operationally completed but failed to produce its intended outcome.
Name a pilot that proved an idea should not continue.
Name lessons that actually changed City practice.
Name lessons the institution failed to implement.
Name the largest incomplete commitment and most urgent decision being handed to the next Council.
Judge the final term not by whether every promise succeeded, but by whether the City told the truth about the promises that did not.
A strong Missed Scorecard should allow a resident to ask:
What did you promise?
What did you miss?
When did you know?
When did you tell us?
Why did it happen?
Was it your responsibility?
Was it Council's decision?
Was another government actually blocking it?
How much did we spend?
What do we still owe?
Was stopping the right decision?
What changed because you learned from it?
Is the same mistake happening again?
What does the next Council inherit?
Government should never fear that page.
A City capable of publishing:
Here are the things we got wrong
is demonstrating something more valuable than perfection.
It is demonstrating:
- accountability;
- maturity;
- institutional memory;
- willingness to learn.
No four-year plan survives four years exactly as written.
Conditions change.
Evidence changes.
Governments change.
Costs change.
The integrity test is whether the record changes too.
Do not erase the miss. Name it. Explain it. Show the cost. Separate failure from responsible restraint. Learn from the cause. Fix the process. Stop what should stop. Hand off what remains. Never change the definition of success merely because the truth became inconvenient.